Week 27:
I was a little disoriented when I drove up to the work site the back way and couldn't find my house for a minute. There was a house just getting it's stucco where my house stood. Since my house already had stucco I thought it was a new house that was built supper fast and mine must be next to it. The house next to it wasn't mine either. WHERE WAS MY HOUSE!! After the confusion I realized that the house getting the stucco was indeed my house. I remembered that I told the supervisor that the stucco on the side of the house under one of the windows got messed up and the stucco guys just painted over it and it looked bad. What I didn't realize is that to fix the problem under the window they had to take all the stucco off the entire side of the house and redo it. The problem is fixed now and my house looks like it did.
The bathroom counter tops were installed.
The finish plumbing was delivered...aka the toilets, kitchen sink, faucets, etc.


The finish plumbing was installed. Now the bathroom looks functional. The water won't be turned on inside the house until we move in though. Then we can truly use the toilet.

The stone on the outside has been started. I thought ALL the stones were round. That's the way the sample shows it. However, you can see in the pictures that some of the stones are not round. This means the rock is not looking like I thought it would. Nor would it be as easy to put up. It should be done soon. We'll see how it turns out.

The outer doors were painted to match the garage door. There wasn't enough paint left to paint the trim around the doors too because they needed it for the other houses. Hopefully soon they will order more and our doors will be complete.
We were so excited to show the house to our friends the Roberts. They've been wanting to see the house for a while and we wanted them to see it. They came down with us and we had a picnic lunch at the park by the house after they toured our home. After the picnic we went through all the other houses in the build that we could. It was so much fun.Week: 29


The counter tops in the kitchen were installed. The only thing that is left in the kitchen is the appliances. They were actually supposed to be installed two weeks ago. All the other homes have their appliances. Even the house that was just finished framing a few weeks ago has their appliances. What frustrates me is that the supervisor came up to CJ and asked him what happened to our appliances. Even if he was joking, it wasn't funny. The supervisor was on vacation for a week and then went to supervise another build while their supervisor went on vacation for a week. We basically had no supervisor for two weeks. While he was gone so many things went undone and now he wonders why things are so far behind. He acts like its not a big deal, but now our August 1st move in is looking like August 31st. I really hope we can catch up.

















The sprinkler system was installed. 

The house was painted. It's all down hill from there. Here is the picture of the doors set up in the basement for their paint that I thought looked really cool. It was like the scene in Monster's Inc. where they had a bunch of doors in a line and each one opened to a different place. It was fun imagining what exotic lands were on the other side of each door.