The first thing done was the installation of the linoleum. This is in the dining room.

Here it is in the kitchen.

This is the master bathroom.

After linoleum we hung the doors back on and added all the hardware to the doors.

Here is our exterior stone. This stone doesn't look at all like the sample I picked from. I sure hope it looks all right because it's not what I was picturing in my head.

Next came the cabinets. The one standing by itself is part of the island. The space between the cabinets there is for the dishwasher.

Here is the other half of the kitchen. The round cabinet in the corner is the lazy susan. I've never had one of those before.

Here is the master bathroom cabinet. It will be wonderful to have two bathrooms.
Since so much progress has been made we took the girls out to see the house. They were so excited to finally see the house again. They wanted to play on the back porch.
Rebecca and Dakota in their room.
Elizabeth and Megan in their room.
Happy family on the front porch.
Before we left Megan decided she wanted to help. She took the dirt from the big pile and put it on the sprinkler system trying to cover it up. She was having fun and didn't want to stop but we had to go.
All in all we are happy with the progress that is finally being made. The seventh house that took forever to frame is almost at the same point as all the other houses now. It won't be long.









The sprinkler system was installed. 

The house was painted. It's all down hill from there. Here is the picture of the doors set up in the basement for their paint that I thought looked really cool. It was like the scene in Monster's Inc. where they had a bunch of doors in a line and each one opened to a different place. It was fun imagining what exotic lands were on the other side of each door.



The final grade and leveling of the yard for the sprinkler system has been done.
The gravel next to the driveway was delivered and spread.
The back porch has been poured. We were only allowed a 12x12 patch of concrete so the porch does not go all the way around the window well but what can you do. They should pour the stairs fairly soon.
The sprinkler system has been delivered.
The paint package and finish hardware have been delivered.
The cabinets have been delivered. After paint and linoleum they will be installed. We moved them into the basement to protect them from the paint. (Side note: a pet peeve of mine is water bottles. See the water bottles on the cabinets? Those are constantly being left behind in all the houses and I haven't figured out who's doing it yet. When I do find the culprit, I will have some words with them. They may not clean up after themselves at home, but it is so rude to leave their trash all over other people's homes.)
We are getting the house ready for paint this week. Paint prep is a boring, tedious, painstakingly detailed job because so many little things must be done in order to insure only the things that are supposed to be painted get painted and all the construction work is covered up by the paint so that everything looks smooth and flawless. Even though it is not a fun job everyone in the group is so happy to finally be doing finish work that we are nearly done with paint prep on all the houses except the last one that just finished framing and doesn't have drywall yet. This picture is of the doors being prepped. We had to take them all off the hinges and cover the hinge holes with tape so that paint does not clog the holes. We had to cover the spot for the hinges on the doorways as well. The doors are now in the basement standing upright waiting for individual paint. I forgot to take a picture but it is amazing how they got all the doors to stand upright. I will hopefully get a picture in this week.
We had to tape off the tubs and any underlayment that was already installed.
We had to cover all the windows and take the hardware off the main doors. Since we couldn't take the doors all the way off we had to tape these hinges while still on the door. The outside of the main doors will be painted a different color than the inside so that is why we couldn't take off the doors. There are so many other little things that have to be done before any painting can take place. But the house is prepped and should be painted this week.

.jpg)
.jpg)



We won't start painting next week like we are supposed to but at least some progress has been made on our house.