This week CJ and I got to help install the sprinkler system at house #5. RHDC had a company come out and trench for us so we thought it was going to go really fast. The trenching however was not as complete as we thought. We started out the day making sure the trenches were deep enough and taking out the huge rocks that seem to plague the ground. CJ helped tunnel the holes underneath the sidewalk to connect those sprinkler heads to the rest, while I dug the large hole for the control boxes. After that I shadowed the person putting the system together, handing him anything he needed for the pipes. I felt like he was the surgeon and I was the nurse. It was a lot of hard work but I loved every minute it. I have never really been a fan of the framing so to finally be able to do something else was a welcome activity. My arms and back are sore from all the digging and I have a big blister on my left hand but I can't wait to do it again. Also, while we were doing our jobs there was a professional crew there installing the vinyl fencing. This is good news because the whole group has been asking if there would be enough money in our budgets to have the fencing installed for us. The office of course has maintained the "no comment" answer every time. Seeing the first house get fencing gave everyone hope that they too would get a fence. I'm happy because that is a the first thing I wanted done after we moved in but I didn't want to have to install it myself. Now we can focus on something else...like grass in the back yard.

Our house is finally getting a driveway and stairs. No more climbing into the house! You don't know how much of a relief that is. You can see a black hose next the the house in this picture. CJ tells me that the hose will be connected to the drain pipes so that the rain water will be directed under ground and collected to water the lawn as well (or something to that affect.) That is really exciting to me. It is an added bonus that I wasn't expecting.

If the weather holds up we will have a completed driveway in a few days.

Here are the stairs on the inside of the garage. There are a lot more steps than I am used to but I am glad they will be concrete. If the door was two more inches higher than the garage floor they would have built a wooden staircase up to the door that looks more like a mini patio deck. While it may sound cool, it's not. Most of the houses in the previous build have them and they look terrible. Not to mention there are at least 9 steps in each of them which makes it a big climb every time you go into the house.

The door leading out of the garage into the backyard. We will most likely expand that spot with more concrete to hold the garbage cans as well.

Our house is finally secure. They have installed the key pad to the garage door so that only those who know the code can get in. See ya later neighborhood kids, and flyer leaving people.
It was supposed to rain off and on all day Saturday. We were optimistic that we could get our work done staying dry when the clouds were gray but there was no rain and the ground was dry. We did get a little rain around noon so we stopped work and had a safety meeting inside the garage. When the meeting was done the rain was gone and we went back to work. Our shoes were now caked in mud but we were dry. The good luck we felt we had didn't quite last all day though because 15 minutes before we were done for the day, the clouds let loose. It was so frustrating because we were so close to being done, and now we were completely drenched and frozen. It took me all night before I finally felt warm again. 15 more minutes and it could have rained all it wanted without a single complaint from me...at least for the rest of that day anyway. Oh well. We really did get a lot accomplished considering the fact that it was supposed to rain all day.
Since there wasn't that much new with our house I thought I would show you what has been going on at the other 6 houses. Again I apologize for the terrible pictures (I think I will take my real camera next time and get some better pictures.) They all look so much better than a cheap camera phone makes them look.
This is house #2. This is our next door neighbor. They are at the same point we are. They too are in the holding pattern.
This is house #3. They just barely got their stucco painted yesterday. They are officially in the hold pattern now too.
This is house #4. This house is waiting for the rest of the shingles (the sub-contractors ran out last week and have yet to finish.) They are also ready for insulation, then drywall, finish carpentry, garage door, and finally stucco. It sounds like a lot but it really should be done in the next two weeks. The owner of this house, that is across the street from our new house, is our neighbor right now living across the street from our current house. Small world, eh? 






This is the underlayment in the kitchen.
This is the underlayment in the master bath. You don't think about all the little details that go into a house until you're asked to do the work. I wanted to tell my supervisor that underlayment is over-rated so let's just skip that step. It really gives me an appreciation for construction workers that have to do this type of frustrating work every day.


I'm so glad that spring is here because I really got tired of shoveling snow off the floor, out of the walls, and off of the lumber so that we could build walls. Well, I guess Mother Nature decided that we haven't had enough snow yet because that picture is of last Saturday. We got there and had to shovel off two inches of snow before we could start, then three of us were constantly sweeping the freshly falling snow trying to keep it from accumulating while the others tried to get the walls up. Will winter never end!?
Even though the weather was not all that good last week they painted the stucco anyway. I'm sure they regret it now because if you look close enough you can see the paint around the window streaked really bad. The main stucco color seemed to hold up well, it was just the trim that streaked. Luckily they had only done a small amount of the trim.
These are the quoins that were an option for the trim (unpainted, of course.) I picked them for the same reason as the rock, to give character. It seems that so far we are one of three houses in the entire neighborhood that picked the quoins.